Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130451
    Date de publication: 2 avril 2014

    Promoteur – Intermédiaire Financier

    Italian utilities

    Lieu

    Description

    A programme loan for funding capital expenditure investments in water, waste, district heating, electricity and gas networks and public lighting by local utilities.

    Objectifs

    The water and wastewater components contribute towards ensuring security of supply, resource efficiency and improving the quality of the water bodies receiving the treated wastewaters. The solid waste components are expected to contribute to meeting the respective targets for diversion of waste from landfills and enable recovery of recyclable materials and possibly also energy from residual waste. The upgrading and the expansion of gas, electricity, public lighting and district heating networks are necessary to maintain a safe and reliable service to existing consumers, meet peak demands, provide for growth in demand, and contribute to increasing energy efficiency.

    Commentaires

    n/a

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    • Déchets solides - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 286 million

    Coût total (montant approximatif)

    EUR 600 million

    Aspects environnementaux

    The investments in the water and waste are expected to have positive net environmental and social impacts, considering their focus on compliance and resource efficiency. The investments in electricity, gas and heat distribution are expected to have minor impacts. Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EC, the Habitats Directive (92/43/EC) and the Birds Directive (79/409/EEC) will be respected and the Bank will publish the non-technical summary of the EIA on its website.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (2004/17/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Approuvé - 4/06/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Énergie Eau, assainissement Déchets solides