Date de publication: 21 février 2014
Promoteur – Intermédiaire Financier
PKP POLSKIE LINIE KOLEJOWE SALieu
Description
The project consists of two components: (i) rehabilitation of about 555 km of electrified mainline railway, mainly double track; and (ii) modernisation of about 310 level crossings.
Objectifs
The project is located, in part, on the TEN-T rail network (Regulation 1315/2013). The project will increase the quality of rail services provided in Poland as well as promote travel by rail. The project will thereby enhance sustainable transport in line with EU objectives. The project is also located in a convergence zone and by facilitating access promotes regional development.
Commentaires
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 100 million
Coût total (montant approximatif)
EUR 714 million
Aspects environnementaux
Component (i) of the project falls under Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU and has been screened out by the competent authorities, which concluded there are no likely significant negative effects on the environment. Component (ii) falls outside Annexes I and II. Thus no EIA has been required for either component. The competent authorities concluded that the project was not likely to have a significant effect on protected areas and no assessment according to the Habitats Directive (92/43/EEC) was necessary. The project's residual negative impact during construction and operation are limited and offset by the expected modal shift facilitated by the investment.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/17/EC and 2007/66/EC (amending Directives 1989/665/EEC and 1992/13/EEC)), with publication of tender notices in the Official Journal of the EU, as and where required.
Statut
Signé - 24/11/2014
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).