Date de publication: 12 décembre 2013
Promoteur – Intermédiaire Financier
COMUNIDAD FORAL DE NAVARRALieu
Description
The project consists of the construction and operation of a pressurised, gravity fed water distribution system for rehabilitating the ecological status of Arga and Ega rivers and irrigating 15,272 ha of arable land. The system derives all water from the existing Itoiz dam through Canal of Navarra. It acts as a substitute for pumping irrigation water up from the over-exploited local river basins. The project increases the efficiency of water and energy use. It is expected to increase yields and open valuable options for new crop patterns.
Objectifs
Environmental Protection, Climate Action (Transversal) and Irrigation.
Commentaires
Secteur(s)
- Eau, assainissement - Agriculture, sylviculture et pêche
Montant BEI envisagé (montant approximatif)
EUR 55 million
Coût total (montant approximatif)
EUR 131 million
Aspects environnementaux
The project is a part of the Canal de Navarra, which was included in the Ebro River Basin Management Plan. It involved water transfer between sub basins of the Ebro River. As such it was subject to Annex I of the EIA Directive (2011/92/EU) and an EIA has been prepared. A SEA was carried out as part of the RBMP procedure. The project involves the restructuring of rural land holdings and is a water irrigation project for agriculture. As such it falls under Annex II of the EIA Directive (2011/92/EU). Environmental permits have been granted by the competent authority. Details will be assessed at appraisal.
Passation des marchés
The Promoter will seek a PPP model implying a concession for the construction and operation of the targeted infrastructure. The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC, 2004/17/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.
Statut
Signé - 28/05/2015
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).