    Promoteur – Intermédiaire Financier

    Republic of Turkey, represented through its Ministry of Transport, Infrastructure Investments General Directorate ("AYGM")

    Lieu

    Description

    The Project involves the additional financing of the Bosphorus Tunnel Project which consists of a rail tunnel crossing underneath the Bosphorus Strait to link the existing commuter lines on the European and Asian side of Istanbul, a city of 13m inhabitants. It also includes the upgrading of these existing lines and the procurement of new rolling stock. Once completed, this flagship investment will constitue the first seamless mass transit system in Istanbul to cross the Bosphorus and link the two sides of the city along 76km of its southern shores. It will also enable high-speed intercity trains to cross the Bosphorus and reach the heart of the city.

    Objectifs

    The Project will enhance the Sustainable Urban Transport network of Istanbul

    Commentaires

    The project cost will be verified during the appraisal.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 350 million

    Coût total (montant approximatif)

    EUR 3749 million

    Aspects environnementaux

    The original Project was appraised in 2004 for compliance to the then prevailing EIB environmental policy and found to be acceptable subject to conditions. The Project was implemented as originally intended and in accordance with relevant original environmental decisions. All environmental conditions had been met and all permits obtained. The appraisal will check the compliance of any possible technical changes with the original environmental permits.

    Passation des marchés

    The Promoter of the Project has undertaken to comply with the Banks procurement guidelines, including international tendering. All parts of the Project have already been tendered drawing significant competition from major international railway contractors consistent with EIB procurement guidelines. This will be verified during appraisal.

    Statut

    Signé - 8/05/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Turquie Transports