    Référence: 20130105
    Date de publication: 12 janvier 2015

    Promoteur – Intermédiaire Financier

    OMNICANE

    Lieu

    Description

    Development of an ethanol plant for biofuel purposes with CO2 capture. The key objective of this operation is to add value through the further processing of molasses, itself a by-product of sugar cane processing.

    Objectifs

    This project forms part of an adaptation strategy to improve the competitiveness of the local sugar industry by ensuring a fully integrated approach to producing sugar and all of its by-products, thereby fostering the country's economic and social development and contributing to sustainable long-term development. The project encompasses the optimal use of natural resources, production of renewable energy as well as carbon dioxide capture, which are fully in line with EU policies.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 8 million

    Coût total (montant approximatif)

    EUR 23 million

    Aspects environnementaux

    An existing distillation facility is to be re-located from a town-centre location to an established industrial site with an existing biomass CHP facility, with additional investments to capture CO2 generated by the process to replace imported gas. There will be an on-site waste-water treatment plant and the final by-product will be converted into fertiliser in an associated plant. The nature and scale of the investment are such that it is unlikely that an environmental impact assessment (EIA) would have been required if the plant had been located within the EU. The position in respect of national legislation will be confirmed at appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 6/12/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.