Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20120688
Date de publication: 7 octobre 2013

Promoteur – Intermédiaire Financier

Private sector company

Lieu

Description

The project comprises four gas-fired, combined heat and power (CHP) plants in various locations in Poland. The new units will be located within the boundaries of the existing heat and power generating facilities and replace obsolete coal-fired installations.

Objectifs

The projects will contribute to meeting heat and electricity demand at a competitive cost using natural gas as a a fuel source. All components of the project are located in a convergence region. The project is therefore eligible under Article 309 point (a) projects for developing less-developed regions and point (c) common interest of the Treaty on the functioning of the EU. The financing of these investments will contribute to the EIB's lending priority policies on energy efficiency, diversification and security of supply, climate action, and on convergence regions.

Commentaires

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

PLN 490 million (EUR 117 million)

Coût total (montant approximatif)

PLN 1960 million (EUR 466 million)

Aspects environnementaux

The project falls either under Annex 1 or Annex 2 of the Environmental Impact Assessment (EIA) Directive. The projects falling under Annex 2 were screened out by the competent authority in accordance with the national legislation. The environmental aspects of all four projects and the completed EIAs will be assessed during the appraisal. All the plants will be located on brown field sites within the boundaries of existing facilities. It is expected that the electricity generated by the plants will be co-generated at high efficiency as defined by the Energy Efficiency Directive 2012/27/EU.

Passation des marchés

The Bank will confirm during the appraisal that the promoter procures the contracts in accordance with the applicable EU procurement legislation (Directive 2004/17/EC), with publication of tender notices in the EU Official Journal.

Statut

Signé - 27/10/2015

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Énergie