Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20120597
    Date de publication: 23 mai 2013

    Promoteur – Intermédiaire Financier

    ESPOON KAUPUNKI

    Lieu

    Description

    The construction of a new hospital focusing on rehabilitation and long-term care in Espoo, Finland.

    Objectifs

    The city has taken the decision to build a new hospital with 260 beds plus 30 places for day treatments next to the existing general hospital, in order to establish synergies and share support services. The patients and customers of the new facility will be mainly adults who have a sickness or post-sickness condition that requires hospital treatment or rehabilitation. The new hospital will work as a pathfinder for new type of integrated (basic and specialised) health care services by developing new processes within the facility and offering a wide range of acute and post-acute services and specialties (orthopaedic rehabilitation, neurological rehabilitation, infection unit, general geriatrics).

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 75 million

    Coût total (montant approximatif)

    EUR 150 million

    Aspects environnementaux

    Hospitals are not specifically mentioned in the Environmental Impact Assessment (EIA) Directive 2011/92/EU, though the project may be covered by Annex II of the Directive in relation to urban development. The Bank’s services will verify during appraisal whether an EIA is required and the screening decision of the competent authority. The construction on the site is subject to the respect of specific visual landscape requirements. It is expected that the project will have positive social benefits as healthcare is an element of social cohesion.

    The public building will be required to at least meet the relevant national targets on energy efficiency. The design energy performance of the hospital and any specific related targets to be met will be verified during appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/17/EC/ or 2004/18/EC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 6/11/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Finlande Santé