    Référence: 20120430
    Date de publication: 18 février 2013

    Promoteur – Intermédiaire Financier

    DONG ENERGY A/S IBERDROLA SA Each Promoter will normally be entitled to up to 50% of the proposed EIB finance.

    Lieu

    Description

    The Project is a 389 MW offshore windfarm in the Irish Sea (Northwest England), comprising 108 turbines on monopile foundations.

    Objectifs

    The Project comprises the development, construction, operation and maintenance of a 389 MW offshore wind farm in the Irish Sea. It is located 14 kilometres southwest of Barrow- in-Furness in the Northwest of England, where the water depth ranges between 17 and 24 meters. The Project’s grid connection assets will be transferred to an independent operator (OFTO) after construction.

    Commentaires

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    GBP 170 million (EUR 203 million)

    Coût total (montant approximatif)

    GBP 1360 million (EUR 1627 million)

    Aspects environnementaux

    By virtue of its technical characteristics the Project is classified as an Annex II-project according to the EIA- Directive 2011/92/EU. National legislation requires a full EIA including public consultation for offshore wind farms. EIA was conducted including a detailed biodiversity assessment, covering marine and terrestrial habitat, mammals, birds, fish and benthic fauna. The approval was granted by the competent authority following extensive public consultation.

    Passation des marchés

    The Promoter is not subject to the Utilities Directive 2004/17/EC for the purchase of the Project’s equipment as the concession to build an offshore wind farm was granted following a competitive tender (Round 2) launched by the UK government.

    Statut

    Signé - 31/01/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Énergie