Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20120256
    Date de publication: 15 mars 2016

    Promoteur – Intermédiaire Financier

    MERSEYTRAVEL

    Lieu

    Description

    The project consists of the acquisition of electrically powered rolling stock for use on Merseytravel's network in Merseyside, Cheshire and West Lancashire in the northwest of England together with associated upgrades to the railway's infrastructure and maintenance depots.

    Objectifs

    Merseytravel wishes to procure a new fleet which will be in service by the early 2020s. The project will contribute to the continuation, improvement and development of reliable high quality public transport services in Merseyside, Cheshire and West Lancashire and encourage modal shift away from road transport promoting time, vehicle operating cost and safety benefits.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 245 million (GBP 190 million)

    Coût total (montant approximatif)

    EUR 516 million (GBP 400 million)

    Aspects environnementaux

    Manufacture of rail rolling stock doesn't fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU. Compliance with EU legislation and the environmental impact of the project will be examined during the project appraisal. The project helps to reduce reliance on private cars and the negative impact of transport on the environment, thus contributing to climate change objectives.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (in this case Directive 2004/18/EC and Directive 2007/66/EC (amending Directives 1989/665/EEC and 1992/13/EEC)), with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 29/12/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Transports