    Référence: 20120160
    Date de publication: 11 mai 2012

    Promoteur – Intermédiaire Financier

    ISRAEL CHEMICALS LTD

    Lieu

    Description

    Construction of a Combined Cycle Gas Turbine (CCGT) for Israel Chemicals Ltd's (ICL) own use. The plant will be fired by natural gas and located in Israel on ICL plant's premises in the Southern part of the Dead Sea.

    Objectifs

    The project fulfills the Bank's external mandate objective to develop economic energy infrastructure as it will contribute to increased electricity production. It also fulfills the Bank's external mandate objective to develop the local private sector as it will support an Israeli private sector company. In addition, because of its expected efficiency and due to the usage of a low-carbon fuel, the CCGT plant's carbon intensity will be 50% lower than average carbon intensity of electricity in Israel and much lower than emissions from the current Heavy Fuel Oil-fired generator of the industrial site.

    Commentaires

    This operation is covered by the EU Political Risk Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 354 million

    Aspects environnementaux

    The Environmental Impact Assessment for the project was completed in 2009 and it did not identify any significant negative residual impacts of the investment. The plant's construction is planned on a site next to the existing industrial plant and on land designated for industrial use, so it is expected that its environmental impact will be relatively limited for a project of this nature. The use of natural gas will result in significantly lower level of specific emissions than those resulting from the current use of Heavy Fuel Oil.

    Passation des marchés

    The Bank will require the promoter to ensure that the project will be implemented in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 17/12/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).