Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20120159
    Date de publication: 24 juillet 2012

    Promoteur – Intermédiaire Financier

    Government of the Territory of French Polynesia

    Lieu

    Description

    Investment loan to the Government of the Overseas Territory French Polynesia with a maturity of up to 15 years for the implementation of a new seawater air-conditioning system (SWAC) for the Centre Hospitalier de Polynésie Française (CHPF) to reduce high-cost electricity consumption and emissions of greenhouse gases. The investment loan will be provided to the Government of French Polynesia for onlending to the Centre Hospitalier de la Polynésie Française.

    Objectifs

    The project will contribute to realising French Polynesia's objectives of increasing the share of renewable energy to 50% in 2020, and 100% in 2030. While air-conditioning represents 40% of electricity consumption in French Polynesia, the Centre Hospitalier de Polynésie Française consumes 50% of its electricity for operating its air-conditioning system. Through a considerable reduction of its operating cost by decreased electricity expenses, the project will contribute to safeguarding the provision of sustainable health and hospital services.

    Commentaires

    This operation is proposed as a co-financing agreement with Agence Française de Développement (AFD) and other co-financiers under the Mutual Reliance Initiate. It is agreed that AFD shall act as Lead Financier for the purposes of the Operational Guidelines.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 8 million

    Coût total (montant approximatif)

    EUR 25 million

    Aspects environnementaux

    The project falls under the EIA Act 2003 requiring a full Environmental Impact Assessment. It is assumed that the project will not have significant negative environmental impacts. It is rather anticipated that the overall impact on the environment is beneficial in the sense that it will result in reducing emissions from substituted thermal power generation. These assumptions are expected to be confirmed by the EIA process that has just been initiated under the management of AFD.

    Passation des marchés

    The procurement of the project will be managed by AFD, Lead Financier under this MRI operation. AFD will require the promoter to ensure that implementation of the project will be done in accordance with AFD's own procurement rules and the Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 28/12/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Polynésie Française Énergie