    Promoteur – Intermédiaire Financier

    BERLINER VERKEHRSBETRIEBE

    Lieu

    Description

    Rehabiltiation of infrastructure in the Berlin underground network including reduced mobility access, safety measures and signalling systems during 2012-2015

    Objectifs

    The project will improve the quality of public transport service in terms of travel time, comfort and reliability and will increase the attractiveness of public transport in the metropolitan area, thus contributing to reduce reliance on private cars and their negative impact on the environment and congestion. In addition, the project will include noise abatement measures which will improve the comfort not only for passengers at stations and in the vehicles but also for people in the surroundings. People with reduced mobility and disabilities will also have better access to the stations and trains, in line with the objectives on passengers rights set in the 2011 White Paper. The project is therefore eligible under Article 309 point (c) common interest, sustainable transport.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 150 million

    Coût total (montant approximatif)

    EUR 300 million

    Aspects environnementaux

    The rehabilitation and upgrading of railways fall under Annex II of the EU EIA Directive, according to which the need for a full EIA is decided on a case-by-case analysis by the Competent Authority. The need for Environmental Impact Assessment(s) will be analysed during appraisal once the final scope of the project is defined, together with any potential significant or negative impacts of the project on areas included in the Natura 2000 network (according to the Habitats Directive 92/43/EEC and the Birds Directive 79/409/EEC). The question of the project falling within a plan or a programme requiring a Strategic Environmental Assessment (SEA) in line with EU Directive 2001/42/EC will also be further examined during appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EEC/ or 2004/17/EEC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 16/11/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Transports