    Référence: 20120012
    Date de publication: 9 juillet 2012

    Promoteur – Intermédiaire Financier

    Petkim Petrokimya Holding A.S.

    Lieu

    Description

    Capacity expansion and modernisation of the existing mid-sized ethylene plant in Aliaga (near Izmir).

    Objectifs

    The project will increase the efficiency of the existing plant and reduce operating cost, thus adding local value to the diversification of Turkey’s industrial base while reducing import dependency. The project should help to keep prices down on ethylene-derived products. This in turn should support the domestic supply to local downstream industrial activities. Local employment will further be safeguarded and indirect employment created. Employment will further be created during the two-year implementation period.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 40 million

    Coût total (montant approximatif)

    EUR 92 million

    Aspects environnementaux

    An equivalent project in the EU would fall under Annex II of EU Directive 2011/92. An Environmental Impact Study (EIS) has been prepared, public consultations have been held and the Environmental Impact Assessment (EIA) has been approved by the competent authority. The plant additions comply with best available technology (BAT) standards. Additional environmental load is limited and partly reversed into a net gain, such as e.g. for NOx, due to the partial burner replacement with low NOx burners. The non-technical summary (NTS) and the EIS have been disclosed according to national law. An English translation of the NTS and the project relevant parts of the original Turkish EIS document are available on the EIB website.

    Passation des marchés

    The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank’s Guide to Procurement

    Statut

    Signé - 29/04/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).