Date de publication: 14 mars 2012
Promoteur – Intermédiaire Financier
BulgariaLieu
Description
Construction of 65.62km new dual carriageway motorway between Plodovitova and Hermanli, completing the motorway connection between Sofia and the Turkish border on TEN corridors IV and X.
Objectifs
The project will contribute to complete the current motorway, reduce travel time and vehicle operating costs, shift transit traffic and relieve adjacent villages from Heavy Goods Vehicle traffic, thus improving local living and safety conditions.
Commentaires
Under Framework Loan
Secteur(s)
Montant BEI envisagé (montant approximatif)
In the order of EUR 40 million
Coût total (montant approximatif)
In the order of EUR 205 million
Aspects environnementaux
The project falls under Annex I of the EIA Directive 85/337/EEC as amended. An EIA has been carried out with official approval having been granted on 02.07.2010. The EIA procedure, including issues related to the Habitats and Birds Directives, are to be assessed during appraisal.
Passation des marchés
The Promoter is a public entity and is therefore subject to EU Procurement Directives. The construction works have been tendered through an open procedure in two lots in 2011. The tender procedure and award of contracts will be reviewed during appraisal.
Statut
À l'examen - 14/03/2012
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).