    Référence: 20110455
    Date de publication: 25 janvier 2012

    Promoteur – Intermédiaire Financier

    Government of Malta, through the Ministry of Finance, the Economy and Investment and the Ministry of Infrastructure, Transport and Communications. Project management is the responsibility of the Grand Harbour Regeneration Corporation (GHRC), a fully State-owned company.

    Lieu

    Description

    Construction in the Maltese capital, Valletta (a UNESCO world heritage site), of a new city gate, a new Parliament building and a piazza and performing space at the site of the former Royal Opera House destroyed during World War II.

    Objectifs

    The construction of the new Parliament and the improvement and upgrading of urban infrastructure are both a condition for the city’s continuing sustainable social and economic development, upgrading of the urban environment and developing of the existing attractions such as urban landscape and cultural heritage buildings.

    The project would thus contribute to the city’s regeneration and long-term economic growth, in the country that has a strong dependence on tourism.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 40 million

    Coût total (montant approximatif)

    Up to EUR 100 million

    Aspects environnementaux

    The construction of a public building falls under Annex II of the EIA Directive 85/337/CE, as amended by Directives 97/11/EC and 2003/35/EC (urban development project), according to which the competent authority decides on the full EIA on a case by case basis.

    Environmental issues will be discussed and examined at appraisal stage, together with the verification of the correct application of EU relevant Directives, explicitly those on environment (the EIA Directive and its subsequent revisions as cited above, the SEA Directive, as well as the EU Habitats Directive and Birds Directive), and the Directive on Energy Performance of Buildings.

    Passation des marchés

    The Bank will require the promoter to ensure that all construction and services contracts for the implementation of the project are tendered in accordance with the relevant EU procurement legislation with parallel publication of tender and contract notices in the EU Official Journal, as and where appropriate. Procedures will be assessed during appraisal.

    Statut

    Signé - 25/06/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Malte Aménagement urbain