    Référence: 20110328
    Date de publication: 15 mars 2012

    Promoteur – Intermédiaire Financier

    KONINKRIJK DER NEDERLANDEN through Rijskwaterstaat, a body of the Ministry of Infrastructure and the Environment

    Lieu

    Description

    The project is part of a wider program to improve traffic on the road corridor between Schiphol-Amsterdam-Almere (SAA). The project involves widening and maintaining approximately 21 km of the A1/A6 motorway.

    Objectifs

    Almere, to the East of Amsterdam, has been identified as an area for future urban development. Rijskwaterstaat estimates the A1/A6 widening as necessary to support both future population growth and ease existing congestion.

    Commentaires

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 256 million

    Coût total (montant approximatif)

    EUR 1335 million

    Aspects environnementaux

    The project was included in the national strategic planning (MIRT) before the application of SEA Directive. It falls under Annex II of EIA Directive 97/11 and has been screened in by the competent authorities and subject to a full EIA. The approval of the EIA is embedded in the Route Decision, ratified on 4/01/2012 and received by the Bank. There are 3 Natura 2000 sites in the project area which the project is not expected to impact significantly. Compliance with Habitats (92/43/EEC) and Birds Directives (79/409/EEC) will be verified during appraisal.

    Passation des marchés

    The project is being procured as a PPP - DBFM, through an international open tender with publication in OJEU (ref.2011/S 106-173608), under a competitive dialogue procedure. The Concessionaire will be responsible to design, build, finance and maintain the investment under a 25 year term service contract. At present, the project is at dialogue stage with 3 consortia. Procurement process and its compliance on Directive 2004/18/EC will be verified in detail during appraisal.

    Statut

    Signé - 26/02/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.