Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20110289
    Date de publication: 5 mars 2012

    Promoteur – Intermédiaire Financier

    Romanian National Company of Motorways and National Roads (RNCMNR)

    Lieu

    Description

    The project consists of the construction of approximately 27.4 km of motorway and a 11 km link road to Lugoj. To the west the motorway will connect to the Timisoara-Lugoj motorway, and to the east to the town of Dumbrava thus forming the first section of the Lugoj-Deva motorway. The project is part of the overall development of priority TEN-T corridor 7.

    Objectifs

    Construction of Lugoj-Deva Motorway – Section Lugoj-Dumbrava

    Commentaires

    Under Framework Loan.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 4,6 million

    Coût total (montant approximatif)

    EUR 202,2 million

    Aspects environnementaux

    The project is part of the Strategic Operational Plan-Transport (SOPT-T) which was subject to a strategic environmental assessment following Romanian legislation in accordance with SEA Directive 2001/42/EC. The Environmental report was approved in January 31, 2007. The project falls under Annex I of the Directive 85/337/EEC on Environmental Impact Assessment (EIA) as amended and an EIA has been satisfactorily carried out. The main residual negative impacts of the project are: conversion and permanent loss of agricultural and forest land, additional noise, vibration, visual alteration of the landscape and severance of flora and fauna habitats. A number of mitigation measures have been specified in order to reduce the negative impacts of the project. The motorway crosses only rural lands and does not require any resettlement of persons. The project is therefore acceptable for Bank financing from an environmental point of view.

    Passation des marchés

    The RNCMNR is a publicly owned company subject to the provisions of the public procurement Directive 2004/18/EC, as transposed into Romanian Law. Procurement commenced in December 2010 with relevant announcements being published in Romania and the OJEU. The procurement of the sub-project is deemed acceptable by the Bank.

    Statut

    À l'examen - 5/03/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Transports