Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20110235
    Date de publication: 20 août 2013

    Promoteur – Intermédiaire Financier

    APA CANAL CHISINAU

    Lieu

    Description

    Rehabilitation of the Chisinau water supply and wastewater collection and treatment facilities

    Objectifs

    The project will support a priority investment programme to rehabilitate the water supply and sewage collection systems and to modernise the wastewater treatment in the capital of Moldova. The investments are predominantly aimed at reducing water leakage and energy consumption, and improving water and wastewater services for the population of Chisinau. Energy efficiency is also high on the agenda, by replacing very old equipment like water pumps. The project's economic interest is thus directly linked to improving the quality of the environment and reducing public health risks via the adequate supply of drinking water and collection,and the treatment and disposal of wastewater.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 24 million

    Coût total (montant approximatif)

    EUR 62 million

    Aspects environnementaux

    The project will generally benefit the environment and public health, by providing better drinking water to the population, improving the efficiency of the treatment and distribution facilities, and by collecting and cleaning wastewater before it is discharged into water reception bodies and eventually into the Black Sea. The main objective of the project is the compliance with the water quality and service standards as set by the EU directives and partially transposed into national law. Compliance with national EIA legislation that has been drafted by partially transposing EU's EIA Directive will be verified during the appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 19/12/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Rep. De Moldova Eau, assainissement