    Référence: 20100577
    Date de publication: 22 novembre 2011

    Promoteur – Intermédiaire Financier

    Romanian National Company of Motorways and National Roads (RNCMNR)

    Lieu

    Description

    The Rehabilitation of the NR 24 and NR 24B.

    Objectifs

    The project concerns the rehabilitation and upgrade of 94.7 km of national road (TEN-T), located on the NR 24 and on the NR 24B.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 29.2 million

    Coût total (montant approximatif)

    EUR 99.1 million

    Aspects environnementaux

    The project is promoted through the SOP-T which was subject to a strategic environmental assessment following Romanian legislation in accordance with SEA Directive 2001/42/EC. The Environmental report was approved on January 31, 2007.

    The project falls under Annex II of the EIA Directive, as transposed into the Romanian Law, and the competent authority did not deemed an EIA necessary.

    The project is located in the vicinity of five Natura 2000 sites and the Competent Authority confirmed that the project is likely to have no significant impacts on any of the sites.

    Being rehabilitation of an existing road, following the same alignment and involving limited land take, the project will have mainly limited temporary and reversible negative residual impacts in the construction phase. On the long term, the project is expected to have positive benefits in terms of road safety.

    Further aspects are to be assessed during appraisal.

    Passation des marchés

    The Promoter is a public entity and is therefore subject to EU Procurement Directives. The construction works have been tendered through an open procedure in three lots and contracts awarded in mid 2011. The tender procedure and award of contracts will be reviewed during appraisal.

    Statut

    À l'examen - 22/11/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Transports