Date de publication: 14 novembre 2012
Promoteur – Intermédiaire Financier
REGIONE CALABRIALieu
Description
Construction of the first tramway line linking Cosenza Rende and the University of Calabria with a length of 10.5 km and 25 stops and the subsequent acquisition of rolling stock under FWL Regione Calabria Convergenza 2007-2013
Objectifs
The project is expected to improve effectiveness and attractiveness of public transport thus contributing to the limitation of excessive reliance on private cars and improving urban environment.
Commentaires
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 36 million
Coût total (montant approximatif)
EUR 160 million
Aspects environnementaux
The new tramway line falls under Annex II of the consolidated EIA Directive. Accordingly, the need for a full EIA is decided by the Competent Authority. In this case, based on the outcomes of a preliminary environmental study and following Annex III criteria, the project has been screened-out. All the environmental aspects will be checked at appraisal stage.
Passation des marchés
The Bank will require the Promoter to ensure that contracts for the implementation of the project shall be tendered in accordance with the relevant applicable EU procurement legislation, with publication of tender notices in the EU Official Journal, as and where appropriate.
Statut
Approuvé - 20/12/2012
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).