Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090676
    Date de publication: 10 janvier 2012

    Promoteur – Intermédiaire Financier

    Armenian Water and Sewerage Company (AWSC)

    Lieu

    Description

    The proposed operation consists of the rehabilitation of water supply services in sixteen small towns throughout the country, and water treatment plants and sewerage collectors in two small towns.

    Objectifs

    The main purpose of the project is to improve the quality of the services provided to approximately 300 000 people by raising substantially the continuity of the drinking water supply as well as bringing its quality to international standards. Investments in the wastewater treatment plants would be a first step towards the reduction of the current high levels of pollution in water resources due to a lack of proper treatment in the large majority of the towns.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 7 million

    Coût total (montant approximatif)

    EUR 22 million

    Aspects environnementaux

    The project will have a positive social impact by improving the quality of the water and wastewater services provided by the project to the population consisting mainly of low-income families in small towns. The new wastewater treatment plants will have a net positive impact on the environment but should undergo an ESIA prior to their construction. The project’s compliance with all applicable national environmental legislation as well as the EU environmental and social principles, standards and practices will be verified during appraisal.

    Passation des marchés

    The contracts will be procured by AWSC in accordance with the procurement policies and rules of the EBRD as the lead financier and in compliance with international standards. The calls for tenders and the award notices will be published in the OJEU by the EBRD as appropriate. The contracts could be grouped by type of works and including several schemes to make the procurement more effective with higher competition.

    Statut

    Signé - 7/08/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Arménie Eau, assainissement