Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20080432
    Date de publication: 2 octobre 2017

    Promoteur – Intermédiaire Financier

    Seychelles Port Authority (SPA)

    Lieu

    Description

    The project consists of the rehabilitation and expansion of the commercial port within Port Victoria. This facility is in a state of serious disrepair and has insufficient berthing and yard space to operate efficiently and to meet future needs. The works will include detailed design and construction of a new quay offset from the existing quay, demolition as necessary of the existing quay, extension of the port yard area and dredging.

    Objectifs

    The expansion of the port is expected to have a substantial impact on Seychelles' economic competitiveness, employment creation, sustainable growth and local trade and industry. The project will also pave the way for future private sector involvement, by providing an adequate and efficient infrastructure.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 18 million

    Coût total (montant approximatif)

    EUR 35 million

    Aspects environnementaux

    An Environmental and Social Impact Assessment (ESIA) has been prepared for the project in accordance with Seychelles Environmental Protection Act No. 9 (1994) and has been approved by the Seychelles Government. The approval contained a number of conditions related to earthworks, dredging, water quality, waste management and pollution control. It also requires SPA to prepare and implement a Project Implementation Plan and Construction Environment Management Plan prior to commencement of construction, to be submitted to the Ministry of Environment.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement. All tenders are to be open and transparent with publication of tender notices in the Official Journal of the European Union, as and where required.

    Statut

    Signé - 5/03/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Seychelles et Dépendances Transports