    Référence: 20080231
    Date de publication: 14 octobre 2008

    Promoteur – Intermédiaire Financier

    CFM – Portos e Caminhos de Ferro de Moçambique

    CCFB – Companhia dos Caminhos de Ferro da Beira.

    Lieu

    Description

    Rehabilitation of the transport infrastructure of the Beira corridor, including rehabilitation of the Sena railway line and restoration of the Beira port access channel to its original design characteristics.

    Objectifs

    The project aims at reducing transports costs in the Beira corridor (both at the port and on the railway), improving the safety conditions in the access to the port and ultimately contributing to poverty reduction in Mozambique and neighbouring land-locked countries by improving the performance of the Beira corridor transport system.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to USD 92 million (equivalent to EUR 71 million).

    Coût total (montant approximatif)

    USD 254 million (equivalent to EUR 195 million).

    Aspects environnementaux

    If situated in the European Union, the rail component would likely fall outside the scope of the Environmental Impact Assessment (EIA) Directive, as the works consist of returning existing assets to their original state.  From the Bank’s initial review of available documentation, and subject to further field assessment during the appraisal mission, the port component, if within the EU, could be considered as falling under Annex II of the EU Directive 97/11 but not requiring a full EIA. The Bank’s appraisal mission will review environmental studies and procedures and public consultation for the two components in order to (a) confirm that the project complies with the principles of EU environmental regulations and with national legislation, (b) verify that no internationally/locally protected biodiversity area is likely to be affected, and (c) assess the social impact of the project.

    Passation des marchés

    The Bank will require that the promoters implement the project in compliance with the Bank’s Guide to Procurement. The promoters’ procurement plan and procedures will be reviewed during appraisal.

    Statut

    Signé - 30/04/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).