    Référence: 20070525
    Date de publication: 12 septembre 2008

    Promoteur – Intermédiaire Financier

    The South African National Roads Agency Ltd (SANRAL)

    Lieu

    Description

    The project is part of a wider programme for the extension and upgrading of the national road network in northern South Africa. The following three schemes are currently envisaged for EIB part-financing:

    • The widening of the R21 between Pretoria and the O.R. Tambo International Airport near Johannesburg;
    • The upgrading of the N17 East Toll Road (linking Johannesburg and Swaziland) between Springs and Ermelo; and
    • The completion of the Polokwane Eastern Bypass.

    Objectifs

    Address the current capacity constraints and improve safety

    Commentaires

    Roads and Motorways

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 150 million

    Coût total (montant approximatif)

    Preliminarily estimated at EUR 300 million

    Aspects environnementaux

    The National Environmental Management Act, 1998 (replacing the South African Environmental Conservation Act, 1989) requires that an EIA is carried out for the various schemes. During appraisal, the Bank will review the EIA process adopted by the promoter to confirm that it complies with applicable domestic legislation, the principles laid out in EU Directives and any relevant international conventions to which the Republic of South Africa is party. The Bank will further ascertain whether social aspects related to the schemes are adequately addressed.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in compliance with the Bank’s Guide to Procurement.

    Statut

    Signé - 16/07/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Afrique du Sud Transports