Date de publication: 14 octobre 2005
Promoteur – Intermédiaire Financier
Romania, acting through the Ministry of Public Finance.Lieu
Description
The project consists of the restoration of roads and waterways damaged in the floods of 2004, affecting seventeen counties in Northern Romania, and works to prevent the recurrence of similar events.
Objectifs
Re-establishing normal economic activity as soon as possible. Reconstruction and preventive works will contribute to the reduction of risk from future re-occurrence of similar problems.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 261 million.
Coût total (montant approximatif)
EUR 526 million.
Aspects environnementaux
Schemes are mainly small and mainly replacement of existing infrastrucuture and therefore have little or no new impact on the environment. All schemes will have to take into account the requirements of the Law on Environmental protection 137/1995, which is in line with EU requirements.
Passation des marchés
The Ministries of Finance and of Transport are accustomed to and use the standard Bank requirements.
Statut
Signé - 27/12/2005
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).