Date de publication: 3 mars 2003
Promoteur – Intermédiaire Financier
Egyptian Electricity Holding Co. (EEHC)Lieu
Description
The project consists of a second 750 MWe dual-fired (natural gas and light fuel oil) combined-cycle gas turbine (CCGT) generation module at a new power station that is currently under construction at Nubariya. The power station is designed to accommodate two such CCGT modules; the proposed second generation module is technically identical to the first module for which the Bank signed a loan contract in September 2002.
Objectifs
The project will meet growing electricity demand at a competitive cost using modern energy efficient technology with a relatively low environmental impact. The plant will utilise natural gas for which abundant national reserves are proven and will thus contribute to the use of indigenous resources and the rational use of energy.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 150million
Coût total (montant approximatif)
Estimated at some EUR 340million
Aspects environnementaux
An Environmental Impact Assessment will be carried out according to Egyptian law. The use of natural gas in a modern combined-cycle power plant is expected to result in a relatively low level of pollution. Air and water pollution emissions will comply with all national and World Bank standards.
Passation des marchés
EEHC intends to tender the project in individual lots, using international competitive bidding procedures, as is the case for the earlier projects being financed by the Bank.
Statut
Signé - 15/07/2003
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).