Date de publication: 11 février 2002
Promoteur – Intermédiaire Financier
Metropolitana de Tenerife, S.A.Lieu
Description
Design and construction of the 17 km tramway between La Laguna and Santa Cruz de Tenerife.
Objectifs
The project will contribute to regional development by improving traffic conditions and the urban environment in Santa Cruz.
Commentaires
Environment, Transport and Communication
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to 50% of the total project cost
Coût total (montant approximatif)
Around 240 millions EUR
Aspects environnementaux
The promoter is required to respect the norms imposed by the Directive 97/11/EC. In accordance with its normal procedure, the Bank will ensure that appropriate measures have been defined as regards environmental protection.
Passation des marchés
The promoter is required to respect the European Union Directives as regards procurement procedures.
Statut
Signé - 31/10/2002
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).