Referenz:
20010353
Veröffentlichungsdatum: 11 Februar 2002
Veröffentlichungsdatum: 11 Februar 2002
Projektträger – zwischengeschaltetes Finanzinstitut
Metropolitana de Tenerife, S.A.Ort
Beschreibung
Design and construction of the 17 km tramway between La Laguna and Santa Cruz de Tenerife.
Ziele
The project will contribute to regional development by improving traffic conditions and the urban environment in Santa Cruz.
Kommentar(e)
Environment, Transport and Communication
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to 50% of the total project cost
Gesamtkosten (voraussichtlicher Betrag)
Around 240 millions EUR
Umweltaspekte
The promoter is required to respect the norms imposed by the Directive 97/11/EC. In accordance with its normal procedure, the Bank will ensure that appropriate measures have been defined as regards environmental protection.
Auftragsvergabe
The promoter is required to respect the European Union Directives as regards procurement procedures.
Projektstatus
Unterzeichnet - 31/10/2002