Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 19990291
    Date de publication: 28 septembre 2004

    Promoteur – Intermédiaire Financier

    Road and Motorway Directorate
    Na Pankràci 56
    P.O. BPX 1
    145 05 Praha 4
    Czech Republic
    Attn. Petr Lausman, General Director

    Lieu

    Description

    Construction of two sections (807/I and 807/II) on the motorway from Prague to the Northern border with Germany (D8), for a total length of 23 km. The project has design speeds of up to 120 km/h and includes several bridges, interchanges, a service area, as well as two tunnels (Libouchec and Panenska).

    Objectifs

    The project will eliminate the final missing motorway link between Prague and Dresden and is therefore a top priority on the Czech and German alignments of the pan European corridor IV linking Berlin to Istanbul. The new sections will benefit also from a EUR 62 mil (approx. CZK 1.9 bn) grant from the EU regional funds (ISPA). On the German side, the motorway will be completed by the A17 from the border to Dresden. This project is also being supported by the EU Structural Funds allocated to Germany.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    CZK 12 bn (approximately EUR 400 m).

    Coût total (montant approximatif)

    CZK 21 bn (approximately EUR 700 m).

    Aspects environnementaux

    The project has been subject to a full Environmental Impact Assessment. The cross-border facilities are built according to an intergovernmental agreement between the Czech Republic and Germany. Common environmental mitigation measures have been applied on both sides of the border on the D8 and the A17.

    Passation des marchés

    All work and service contracts financed by the Bank are advertised in the Official Journal of the EU. ISPA-Cohesion Fund procedures apply to sections supported by EU grants.

    Statut

    Signé - 23/09/2004

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    République tchèque Transports