Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Fiche récapitulative

Date de publication
18 juin 2025
Statut
Référence
À l'examen | 19/05/2025
20250316
Nom du projet
Promoteur – Intermédiaire financier
S17 EXPRESSWAY PIASKI - HREBENNE
MINISTRY OF INFRASTRUCTURE / GDDKIA - REPUBLIC OF POLAND
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 450 million
EUR 1164 million
Lieu
Secteur(s)
Description
Objectifs

The project will finance the construction of four non-continuous 93.2 km long S17 expressway sections between Piaski and Hrebenne. In detail, its includes the establishment of a "greenfield", primarily 2x2 lane expressway, mostly along a new alignment, 14 grade-separated interchanges, advanced drainage systems, noise protection screens, as well as approximately 98 engineering structures, including bridges, viaducts, flyovers, and animal crossings. It also encompasses connections to local and service roads, six expressway service areas, and two expressway maintenance centres.

The aim is to address market/network failures related to accessibility. The project contributes to improved efficiency of Poland's Trans-European Network (TEN-T), thereby improving accessibility and market integration. The project will contribute to reduce safety-related negative externalities, by diverting heavy and transit traffic from the agglomerations crossed by the national and local roads. Additionally, it will improve accessibility in the region by adapting the road technical and operational parameters to the forecast traffic level, removing bottlenecks and completing missing elements of an efficient road infrastructure. Overall, the project supports public policy objectives aimed at developing an efficient and safe road transport system, properly adapted to mitigate the negative impacts of climate change.

Aspects environnementaux
Passation des marchés

The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) and is therefore subject to an EIA procedure. Based on the conclusions from the EIA studies, the Competent Authorities have issued three Environmental Decisions for the project sections. Following the design stage, seven second stage supplemental EIA (SEIA) studies were/are being undertaken to apply for a construction permit (ZRID). Construction permit has been granted for section 9 Tomaszów Lubelski - Hrebenne in May 2025. According to a preliminary analysis, the project alignment directly intersects with five NATURA 2000 sites - PLB060013 Dolina Górnej Labunki, PLH060087 Doliny Labunki i Topornicy, PLB060021 Dolina Solokiji, PLB060012 Roztocze, PLH060093 Uroczyska Roztocza Wschodniego. It may also intersect with the NATURA 2000 site PLH 060030 Izbicki Przelom Wieprza depending on the final horizontal alignment. It also runs nearby several other NATURA 2000 sites. The compliance to the requirements of the Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be verified in more detail during the appraisal. Additionally, it contributes to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation. Potential climate risks, the scope and adequacy of the applied adaptation measures for ensuring long-term resilience of the new road, and impact of the project implementation on the GHG emissions will be further assessed during the appraisal.

The project was procured through seven works contracts: four were awarded to a Polish firm, one to a Spanish firm, one to a Turkish firm, and one to a consortium led by a Turkish firm and including partners from Poland and Kazakhstan. During the appraisal, the EIB will review if the promoter has procured contracts for the project implementation according to the applicable EU procurement legislation, Directive 2014/24/EU, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Lien vers la source
Fiche récapitulative

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes