    Montant
    105 000 000 €
    Pays
    Secteur(s)
    Lituanie : 105 000 000 €
    Énergie : 105 000 000 €
    Date(s) de signature
    12/03/2024 : 105 000 000 €

    Fiche récapitulative

    Date de publication
    4 octobre 2024
    Statut
    Référence
    Signé | 12/03/2024
    20230271
    Nom du projet
    Promoteur – Intermédiaire financier
    LITHUANIAN PUMPED HYDRO STORAGE
    AB IGNITIS GAMYBA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 105 million
    EUR 150 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    The project concerns the extension of Kruonis pumped hydro storage power plant by installing an additional pump-turbine unit in the existing powerhouse.

    The development of hydropower pumped storage hydropower supports national and European targets related to renewable energy production and thus contributes to climate change and security of energy supply objectives of the EU. The project is therefore eligible under Article 309 (c) common interest in energy (renewable energy) and also contributes to the environmental protection (tackling climate change). Additionally, it is also in line with the EIB's priority objectives for energy sector lending in the EU related to renewable energy sources and climate action.

    Additionnalité et impact

    Investment in the project will finance the deployment of additional pumped storage capacity in Lithuania, supporting the country's goal of meeting 100% of electricity demand from renewable energy sources (RES) by 2030. The steep increase in intermittent RES, mainly wind energy and photovoltaic (PV), requires a strong increase of flexibility in the grid, including storage capacity and frequency and voltage control, which can be provided by pumped storage hydropower plants.


    Storage technologies act as enabling infrastructure in the energy transition and contribute towards increasing security of fuel supply by reducing dependency on energy imports and ensuring price stability. Security of supply can be considered as a public good, which is not always effectively reflected in market prices.


    The financing of this project is in line with the Bank's energy lending policy by supporting the energy transformation as enabling infrastructure (networks, storage) for the integration of renewable energy sources. Thereby also transversal objectives on Climate Action (mitigation) are met by the project.


    By enabling the increased deployment of intermittent RES the project also addresses negative climate and environmental externalities, a market failure, through the reduction of carbon and air pollution, compared to generation and provision of grid system services based on fossil fuels.


    In terms of project results, the projects are expected to have a positive economic return, considering the economic value of the electricity generated. Therefore, the project is expected to generate a broader positive social benefit by generating clean and renewable power at a cost (LCOE) reasonably below the cost alternatives in Lithuania.


    The project is supported by adequate governance and capabilities of the promoter.


    The long tenor of the EIB loan is in line with the economic life of the underlying assets. The funding of similar maturities is not available on the Lithuanian market. Customised terms such as flexible drawdown are of value to the Promoter because of the multiannual Project's implementation period. Moreover, the EIB involvement should have a crowding-in effect.


    Aspects environnementaux
    Passation des marchés

    The projects may include components that fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU) as amended by Directive 2014/52/EU, thus requiring a review by the competent authorities at the planning/consent stage with due regard to the necessity for environmental and biodiversity impact and appropriate assessments. Lithuania's Environmental Protection Agency (the Competent Authority) approved the project on 2.6.2022 with the comment that no Environmental Impact Assessment is required. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives.

    The EIB will require the promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation Directive 2014/25/EU, with publication of tender notices in the EU Official Journal, as and where required

    Étapes
    À l'examen
    Approuvé
    Signé
    11 mars 2024
    12 mars 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - LITHUANIAN PUMPED HYDRO STORAGE
    Date de publication
    8 Oct 2024
    Langue
    Sujet général
    Prêts
    Numéro du document
    182030224
    Thématique du document
    Information Environnementale
    Numéro du projet
    20230271
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes