Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    400 000 000 €
    Pays
    Secteur(s)
    Turquie : 400 000 000 €
    Eau, assainissement : 400 000 000 €
    Date(s) de signature
    15/11/2023 : 400 000 000 €
    Lien vers la source

    Fiche récapitulative

    Date de publication
    21 juin 2023
    Statut
    Référence
    Signé | 15/11/2023
    20230153
    Nom du projet
    Promoteur – Intermédiaire financier
    EARTHQUAKE RECONSTRUCTION FRAMEWORK LOAN
    ILLER BANKASI AS
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 400 million
    EUR 1550 million
    Lieu
    Secteur(s)
    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    Description
    Objectifs

    The project is designed as a framework loan for the provinces affected by the earthquakes in south-eastern Türkiye in February 2023. The project concerns rehabilitation, construction and extension of drinking water, sewerage and stormwater networks as well as drinking water, wastewater treatment plants, purchase and installation of water utilities' smart systems, machinery and equipment.

    The project is expected to bring substantial public health and environmental benefits from reconstruction and improve access to safe and resilient water, reduced greenhouse gas (GHG) emissions from wastewater services and a more rational use and protection of local water sources from reduction on non-revenue water. By supporting basic municipal infrastructure, the project will restore normal living conditions and economic recovery both for internally displaced, remaining and hosting populations in the affected areas.

    Additionality and Impact

    The project concerns rehabilitation, construction or extension of drinking water, sewerage and stormwater networks as well as drinking water and wastewater treatment plants and purchase and installation of water utilities' smart systems, machinery and equipment in the provinces affected by the earthquakes of 6th February 2023 in south eastern Türkiye. The project forms part of the Team Europe's response to the earthquakes which was announced during the Donors' Conference organized by the European Commission (EC) and Swedish Presidency of the Council on 20 March 2023. The project is also aligned with the EU's development priorities, which are included in the NDICI objectives and will provide an opportunity to build back better and to support the region's modernization of its infrastructure.  


    The EIB financing addresses market failures concerning public goods provision and environmental/ climate externalities, as well as access to finance. The project will contribute 100% to Climate Action and Environmental Sustainability and to several Sustainable Development Goals.


    The reconstruction and recovery activity will provide an opportunity to support basic municipal infrastructure with the aim of restoring normal living conditions for 3.3 m internally displaced people and over 1.7 m already existing Syrian refugees in the affected areas. In the overall affected region counting over 15 m inhabitants, the project will benefit c. 6 m people (hosting population and internally displaced).


    The project will create over 200 permanent jobs during operation and more than 2 000 person-years during construction.


    The Bank's presence ensures compliance with EU policies and international standards, offering valuable technical advice to the Promoter. Furthermore, a dedicated Technical Assistance (TA) funded by the EU grants will be provided for preparation and implementation of the project. In order to start the project preparation quickly, TA funds will also be made available from the EIB loan.


    The favourable terms of the Bank's loan, particularly its long term character, size and cost are important elements supporting the project, especially in view of the vast financing needs in the aftermath of the earthquakes.

    Aspects environnementaux
    Passation des marchés

    The schemes are expected to have minor negative impacts during construction and minor residual impacts during the operational phase. Most schemes will be located in urban environments, on the existing main routes of water mains and sewers and/or within the perimeter of existing facilities. According to the information received from the Promoter, project schemes are not likely to have negative impacts on nature conservation areas. Nevertheless, compliance with the National Biodiversity and Habitats Legislation and its alignment with the EU Habitats and Birds Directives (92/43/EEC, 2009/147/EC) and EIB Environmental and Social Standards will be further checked during assessment of individual schemes, before allocation. It is expected overall that the operation will have positive impacts, specially from pollution prevention in water bodies through improved or new wastewater treatment plants, savings in water through improvement in efficiency of the new and rehabilitated networks and GHG savings also through WWTPs. The project is considered Paris Aligned and compliant with the EIB Climate Road Map.

    The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Commentaires

    The project would form a part of the Team Europe's response to the earthquakes in Türkiye.

    Milestone
    À l'examen
    Approuvé
    Signé
    12 juillet 2023
    15 novembre 2023
    Lien vers la source

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - EARTHQUAKE RECONSTRUCTION FRAMEWORK LOAN
    Date de publication
    19 juil. 2023
    Langue
    Sujet général
    Prêts
    Numéro du document
    170759507
    Thématique du document
    Information Environnementale
    Numéro du projet
    20230153
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes