    100 000 000 €
    Pays
    Secteur(s)
    Serbie : 100 000 000 €
    Énergie : 100 000 000 €
    Date(s) de signature
    27/12/2024 : 100 000 000 €

    Fiche récapitulative

    Date de publication
    16 mai 2024
    Statut
    Référence
    Signé | 27/12/2024
    20220716
    Nom du projet
    Promoteur – Intermédiaire financier
    EPS GREEN FINANCING
    JSC ELEKTROPRIVREDA SRBIJE BELGRADE
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 207 million
    EUR 408 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    Rehabilitation of several large hydropower plants, construction of a 13 megawatt new hydro unit at the Potpec hydroelectric power plant , development and implementation of greenfield renewables

    The operation is a framework loan to finance promoter's key green investments for the period 2024-2030 with a view to increase ultimately the national share of renewables to the target set by 2030. The project tentatively consists of i) the rehabilitation of 239 megawatt (MW) power units in of three hydropower plants (Bistrica hydroelectric power plant (HPP), Potpec HPP and Djerdap HPP) which are totalling 428 MW, ii) the construction of a new 13 MW unit at Potpec HPP, iii) several greenfield renewables of which more than 120 MW solar plants and iv) the rehabilitation of 129 MW Vlasinske hydropower cascade.

    Additionnalité et impact

    The project is a framework loan EPS Green Financing (EIB/20220716) which finances promoter's key green investments in the electricity sector for the period 2024-2030 with a view to increase ultimately the national share of renewables to the target set by 2030. 


    The financing of the Programme is aligned with the Serbian national targets for security of supply as well as decarbonisation in the context of the Intended Nationally Determined Contributions for Serbia. The project will contribute to EU policy objectives with regards to sustainable energy infrastructure, climate mitigation and it is expected to contribute to a number of Sustainable Development Goals (SDGs). This project is in line with EU priorities for Serbia and eligible under NDICI, as it contributes to climate change mitigation as well as to the development of social and economic infrastructure, specifically energy. The project will primarily contribute towards increasing security of energy supply, a public good. 


    The project is expected to have a positive economic return, considering the economic value of the electricity generated. Therefore, the project is expected to generate a broader positive social benefit by generating clean and renewable power at a cost (LCOE) reasonably below the cost alternatives in Serbia.


    The Promoter has extensive experience in the implementation of hydro power plants projects.


    The EIB's financial contribution is substantial and it will include a long maturity, in line with the economic life of the assets and long grace and availability periods, to support the project implementation.

    Aspects environnementaux
    Passation des marchés

    The construction of new hydropower unit would fall under Annex I while the rehabilitation of hydropower units and other small components would usually fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending the EIA Directive 2011/92/EU. The latter Annex II components would require the competent national authority to determine the need for an Environmental Impact Assessment Environmental authorisation has been delivered to Djerdap II HPP rehabilitation. Bistrita HPP was screened out in 2019 by the competent Authorities. The Promoter resubmitted the project to the competent Authority as the scope had slightly increased from the original design. Potpec HPP rehabilitation received its authorisation in 2018. Due to changes in the project (construction of an additional unit IV), the Promoter is carrying out the EIA to be sent to the Competent Authorities in 2024 to obtain the environmental authorisation and the subsequent building permit. Based on preliminary information received, the project components are unlikely to entail any substantial adverse environmental or social impacts. The Bank will review the project's potential environmental and social impacts in line with its Environmental and Social Sustainability Framework upon new allocation request under the framework loan.

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules. The promoter Elektroprivreda Srbije (EPS) is a state-owned electric utility company. Public procurement procedures as set in the Bank's Guide to Procurement will apply.

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Étapes
    À l'examen
    Approuvé
    Signé
    21 juin 2024
    27 décembre 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - EPS GREEN FINANCING
    Date de publication
    28 Jun 2024
    Langue
    Sujet général
    Prêts
    Numéro du document
    205917884
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220716
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Évaluation des incidences environnementales et sociales - EPS GREEN FINANCING - Studija o proceni uticaja na životnu sredinu
    Date de publication
    25 Mar 2025
    Langue
    Sujet général
    Prêts
    Numéro du document
    232173848
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220716
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes