    Signature(s)

    Montant
    450 000 000 €
    Pays
    Secteur(s)
    Portugal : 450 000 000 €
    Énergie : 450 000 000 €
    Date(s) de signature
    5/01/2023 : 150 000 000 €
    22/12/2022 : 300 000 000 €
    Lien vers la source
    Fiche technique

    Fiche récapitulative

    Date de publication
    27 décembre 2022
    Statut
    Référence
    Signé | 22/12/2022
    20220667
    Nom du projet
    Promoteur – Intermédiaire financier
    REN GREEN ENERGY LOAN
    REN - REDES ENERGETICAS NACIONAIS SGPS SA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 450 million
    EUR 606 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    Investments under the promoter's 2022-2026 investment plan, aiming at the extension and reinforcement of the electricity transmission network throughout Portugal.

    The project is expected to support the efficient operation of the electricity transmission network in Portugal, to increase and modernise the capacity of the network, to enable the connection and integration of new renewable energy generators and to enable the promoter to maintain the reliability and quality of electricity supply.

    Additionality and Impact

    The Project will increase the flexibility and resilience of the electricity grid in Portugal and enable the integration of additional Renewable Energy (RE) generation, thus contributing to long-term national and EU decarbonisation targets, and it will help the promoter to maintain the reliability and quality standards of electricity supply in the country.

     

    The project addresses two main market failures. It aims at increasing security and reliability of electricity supply, which have characteristics of a public good. EIB's financing will also help to ensure the integration of renewables and, indirectly, increased electrification (e.g. in transport, industry, etc.), which reduces negative climate and environmental externalities.

     

    The majority of the project components are located in EIB cohesion priority regions in Portugal. In line with the EU Taxonomy, electricity grid infrastructure in the interconnected European system - being on a trajectory to decarbonisation - is considered eligible for climate change mitigation. In addition, a portion of the project is dedicated to improving the resilience of the network to climate change events.

     

    The financing of this project is therefore in line with the Bank's lending priority objectives on Energy (Securing the Enabling Infrastructure) as well as the transversal objectives on Climate Action (mitigation and adaptation) and Economic and Social Cohesion.

     

    The operation will also contribute to the achievement of several United Nations Sustainable Development Goals, with special focus on: SDG 7 (access to affordable, reliable, sustainable and modern energy for all); SDG 13 (combat climate change and its impacts) and SDG 10 (reduced inequalities, as the majority of the project will be located in EIB Cohesion Priority regions).


    The Bank's financial contribution is considered very good and valuable to the client, as the EIB's offering is more favourable than other market alternatives under various dimensions (e.g. longer tenor, availability and grace periods, convertible or revisable rates). The Promoter deems financing with a "Green Loan" label as a stamp of quality on its investments, being in line with its 2021-24 Strategic Plan and its positioning in the green market.

    Aspects environnementaux
    Passation des marchés

    By their technical characteristics, some programme schemes fall under Annex I or Annex II of the Environmental Impact Assessment Directive. The impacts that can be typically expected for these sub-projects relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, impact on flying vertebrates and disturbance during construction. Environmental impact studies will be carried out as applicable and mitigating and/or compensation measures will be applied as necessary.

    The Bank will require the promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Milestone
    À l'examen
    Approuvé
    Signé
    21 décembre 2022
    22 décembre 2022
    Lien vers la source
    Fiche récapitulative

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - REN GREEN ENERGY LOAN
    Date de publication
    11 janv. 2023
    Langue
    Sujet général
    Prêts
    Numéro du document
    161324958
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220667
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes