Signature(s)

Montant
180 000 000 €
Pays
Secteur(s)
Allemagne : 180 000 000 €
Eau, assainissement : 28 620 000 €
Transports : 59 220 000 €
Énergie : 92 160 000 €
Date(s) de signature
15/12/2022 : 28 620 000 €
15/12/2022 : 59 220 000 €
15/12/2022 : 92 160 000 €
Lien vers la source

Fiche récapitulative

Date de publication
22 août 2022
Statut
Référence
Signé | 15/12/2022
20210675
Nom du projet
Promoteur – Intermédiaire financier
AUGSBURG PUBLIC INVESTMENTS
STADTWERKE AUGSBURG HOLDING GMBH
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 180 million
EUR 370 million
Lieu
Secteur(s)
  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
  • Transports - Transports et entreposage
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

Investment programme of the local utility over several years in the sectors of energy, public transport and water.

The objective of the operation is to support the renewal and continued development of key public infrastructure in the city of Augsburg.

Additionality and Impact

The project contributes to natural resource efficiency and environmental protection, as well as to climate action throughout investments in the energy, transport and water sector. It is in line with the Bank's lending policies/orientation for these sectors and the European policy for the protection of the environment, in particular the objectives defined in the relevant Directives (Energy Efficiency, Renewable Energy, Water Framework, Urban Wastewater Treatment, etc.). The energy component contributes to maintaining or increasing security of supply and reduces carbon and air pollution externalities by enabling the integration of clean energy supply and increasing efficiency. The transport components contribute to climate action and reduce the externalities such local air pollution, noise, land take, congestion, greenhouse gases and accidents. The water component contributes to mitigating market failures in the sector by financing infrastructure which generates positive environmental and health externalities that are not fully internalised in water tariffs.


The Bank's loan contributes to the stability and diversification of the Borrower's funding base. It allows the Borrower to draw down funds over a long period, matching the long implementation period of the project, and offers flexible repayment and interest rate options. The Bank's loan offers the Borrower an advantageous interest rate, reducing its funding costs and allowing it to dedicate more resources to the public services it provides.

Aspects environnementaux
Passation des marchés

The environmental and social due diligence will focus on the Promoters' capacity to implement the investment programme in line with EIB's environmental and social standards and requirements, as well as national and EU legislation. The energy part of the programme comprises the implementation of district heating network infrastructure, as well as a number of electricity distribution schemes from low voltage up to 110 kV and renewable energy generation plants. These programme schemes are likely to fall under Annex II of the Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an environmental impact assessment (EIA). It is not expected that an EIA will be required for the transport components in the proposed programme. The water part of the programme mainly consists of the construction and rehabilitation of the water distribution network with house connections as well as the extension and rehabilitation of groundwater sources and a drinking water treatment plant. All components are expected to comply with the relevant EU directives (Drinking Water Directive 2020/2184 and Water Framework Directive 2000/60/EC). Some of the water schemes are likely to require an environmental impact assessment. Therefore, the Promoter will be required to comply with Directive 2014/52/EU amending the EIA Directive 2011/92/EU. The Promoter must also comply with the requirements of the Water Framework Directive, including Art 4(7) where appropriate. According to the available information, the sub-projects are not within or in the vicinity of any Natura 2000 zones. This will be further analysed during appraisal.

The Bank will require the Promoter to ensure that contracts for implementation of the programme have been and will be tendered in accordance with the applicable EU procurement legislation, (Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Lien vers la source
Fiche récapitulative
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Évaluation des incidences environnementales et sociales - AUGSBURG PUBLIC INVESTMENTS - Umweltverträglichkeitsstudie
Date de publication
5 Oct 2022
Langue
Sujet général
Prêts
Numéro du document
160972402
Thématique du document
Information Environnementale
Numéro du projet
20210675
Pays
Disponible au public
Télécharger maintenant
Fiche technique sur les aspects sociaux et environnementaux - AUGSBURG PUBLIC INVESTMENTS
Date de publication
13 Dec 2022
Langue
Sujet général
Prêts
Numéro du document
158318864
Thématique du document
Information Environnementale
Numéro du projet
20210675
Pays
Disponible au public
Télécharger maintenant
Autres liens
Fiche récapitulative

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes