Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    180.000.000 €
    Länder
    Sektor(en)
    Deutschland : 180.000.000 €
    Wasser, Abwasser : 28.620.000 €
    Verkehr : 59.220.000 €
    Energie : 92.160.000 €
    Unterzeichnungsdatum
    15/12/2022 : 28.620.000 €
    15/12/2022 : 59.220.000 €
    15/12/2022 : 92.160.000 €

    Übersicht

    Veröffentlichungsdatum
    22 August 2022
    Projektstatus
    Referenz
    Unterzeichnet | 15/12/2022
    20210675
    Projekttitel
    Projektträger – Finanzintermediär
    AUGSBURG PUBLIC INVESTMENTS
    STADTWERKE AUGSBURG HOLDING GMBH
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 180 million
    EUR 370 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    Investment programme of the local utility over several years in the sectors of energy, public transport and water.

    The objective of the operation is to support the renewal and continued development of key public infrastructure in the city of Augsburg.

    Zusätzlichkeit und Wirkung

    The project contributes to natural resource efficiency and environmental protection, as well as to climate action throughout investments in the energy, transport and water sector. It is in line with the Bank's lending policies/orientation for these sectors and the European policy for the protection of the environment, in particular the objectives defined in the relevant Directives (Energy Efficiency, Renewable Energy, Water Framework, Urban Wastewater Treatment, etc.). The energy component contributes to maintaining or increasing security of supply and reduces carbon and air pollution externalities by enabling the integration of clean energy supply and increasing efficiency. The transport components contribute to climate action and reduce the externalities such local air pollution, noise, land take, congestion, greenhouse gases and accidents. The water component contributes to mitigating market failures in the sector by financing infrastructure which generates positive environmental and health externalities that are not fully internalised in water tariffs.


    The Bank's loan contributes to the stability and diversification of the Borrower's funding base. It allows the Borrower to draw down funds over a long period, matching the long implementation period of the project, and offers flexible repayment and interest rate options. The Bank's loan offers the Borrower an advantageous interest rate, reducing its funding costs and allowing it to dedicate more resources to the public services it provides.

    Umweltaspekte
    Auftragsvergabe

    The environmental and social due diligence will focus on the Promoters' capacity to implement the investment programme in line with EIB's environmental and social standards and requirements, as well as national and EU legislation. The energy part of the programme comprises the implementation of district heating network infrastructure, as well as a number of electricity distribution schemes from low voltage up to 110 kV and renewable energy generation plants. These programme schemes are likely to fall under Annex II of the Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an environmental impact assessment (EIA). It is not expected that an EIA will be required for the transport components in the proposed programme. The water part of the programme mainly consists of the construction and rehabilitation of the water distribution network with house connections as well as the extension and rehabilitation of groundwater sources and a drinking water treatment plant. All components are expected to comply with the relevant EU directives (Drinking Water Directive 2020/2184 and Water Framework Directive 2000/60/EC). Some of the water schemes are likely to require an environmental impact assessment. Therefore, the Promoter will be required to comply with Directive 2014/52/EU amending the EIA Directive 2011/92/EU. The Promoter must also comply with the requirements of the Water Framework Directive, including Art 4(7) where appropriate. According to the available information, the sub-projects are not within or in the vicinity of any Natura 2000 zones. This will be further analysed during appraisal.

    The Bank will require the Promoter to ensure that contracts for implementation of the programme have been and will be tendered in accordance with the applicable EU procurement legislation, (Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Umwelt- und Sozialverträglichkeitsprüfung - AUGSBURG PUBLIC INVESTMENTS - Umweltverträglichkeitsstudie
    Datum der Veröffentlichung
    5 Oct 2022
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    160972402
    Thema
    Umweltinformationen
    Projektnummer
    20210675
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen
    Formblatt ökologische und soziale Aspekte - AUGSBURG PUBLIC INVESTMENTS
    Datum der Veröffentlichung
    13 Dec 2022
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    158318864
    Thema
    Umweltinformationen
    Projektnummer
    20210675
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen
    Andere Links

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen