Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Fiche récapitulative

    Date de publication
    3 juin 2021
    Statut
    Référence
    Approuvé | 13/07/2022
    20200902
    Nom du projet
    Promoteur – Intermédiaire financier
    H2 GREEN STEEL
    H2GS AB
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    not disclosed
    not disclosed
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project is the implementation of a 2.5 million tons per year hydrogen-based integrated primary steel manufacturing plant. The plant encompasses the following innovative first-of-a-kind commercial scale components: a large scale electrolysis-based hydrogen generation plant, an hydrogen-based direct reduced ironmaking (DRI) plant combined with electric arc furnace (EAF) steelmaking and all associated downstream facilities. The outcoming steel will be very low carbon, meaning the plant will manufacture green high-quality flat carbon steel products targeting mainly the automotive, construction, white goods, industrial equipment and energy sectors.

    Using green hydrogen based fully or primarily on carbon neutral electricity in steel-making, the objective is to abate close to 90% or more of the CO2 emissions associated with traditional blast furnace steel making.

    Aspects environnementaux
    Passation des marchés

    The proposed first-of-a-kind and innovative iron and steelmaking manufacturing route is considered to be breakthrough in terms of low carbon steelmaking and expected to reduce greenhouse (GHG) emissions significantly. The hydrogen based DRI process combined with electrified downstream facilities will abate around 90% or more of emissions associated with traditional coke-based primary steelmaking processes. When implemented, the plant will be the first large scale and very low carbon primary steelmaking plant in Europe and the world and hence entails extensive positive environmental externalities. The new plant is subject to an environmental impact assessment (EIA) according to the EIA directive. The final location of the plant has been defined. The Promoter is already in close contact with the competent authorities and stakeholders since project initiation in order to inform local stakeholders about the project and its potential positive and negative impacts. The full impact study (EIA) is in preparation and will be followed by a public consultation period. The installation does fall under the SEVESO directive as well. The final integrated environmental permit will encompass the operational and construction permits as well as the SEVESO requirements.

    The Promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the Promoter is subject to EU public procurement legislation, then the Bank would duly inform the Commission Services and would require the Promoter to apply those rules.

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes