- Transports - Transports et entreposage
Construction of state road DC403 from Surinje Interchange to Port of Rijeka. The road will run from the Skurinje Node on highway A7 to the Core network maritime Port of Rijeka, mainly through a tunnel. The objective is to remove the bottleneck between the Port of Rijeka and its hinterland. The road DC403 will effectively connect the Port of Rijeka (Zagreb pier) to the highway A7, both part of the Trans-European Transport Network (TEN-T), Mediterranean Corridor (Rijeka-Zagreb-Budapest). The project benefits from a EU grant under European structural and investment funds (ESIF).
The objective is to remove the bottleneck between the Port of Rijeka and its hinterland. The construction of the DC403 will effectively connect the Port of Rijeka (Zagreb pier) to the highway A7, both part of the TEN-T network, Mediterranean Corridor (Rijeka-Zagreb-Budapest). The project benefits from co-financing with ESIF.
By providing with an efficient transport link between the port of Rijeka and the hinterland TEN-T road network across the city, the project effectively addresses the incomplete network market failure. It improves the accessibility and contribute to a sustainable development in the area. By shifting the freight traffic away from the street network into a road built inside a tunnel and on a viaduct, it will improve living conditions in Rijeka while enabling further port development. The project contributes to PPG 'Sustainable regions and cities'.
Given the high investment costs and existing alternatives to the development of port activities in the Adriatic basin, the co-financing of this project between the EC and EIB has a positive impact on the implementation of the project.
The EIB's involvement will facilitate the absorption of EU structural funds by securing national co-financing contributions of EU funded projects in Croatia. The EIB financing provides an essential financial contribution in the form of financial advantage that is currently not available in the market.
The project is part of several investment programmes and its impacts were captured in several strategic environmental assessments, in line with SEA Directive 2001/42/EC, enacted into the Croatian Law, An environmental impact assessment (EIA) in line with the EIA Directive 2011/92/EU as amended by Directive2014/52/EU was also undertaken. No protected sites are in the impact area of the project, therefore the competent authority considered the project acceptable under the Directives 92/43/EEC and 2009/147/EC.
The Bank will require the Promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).
Documents
Informations et observations générales
La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.
Informations aux médias
Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.
Mécanisme de traitement des plaintes
Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.
Tolérance zéro face à la fraude et à la corruption
La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.
Publications connexes