Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20230607
Date de publication: 8 mai 2025

Promoteur – Intermédiaire Financier

MWANZA URBAN WATER SUPPLY AND SANITATION AUTHORITY

Lieu

Description

The project will fund the expansion of water supply and sanitation services in Mwanza South, as well as the extension of the Butimba Treatment facility. The project will be implemented in close collaboration with AFD (Agence Française de Développement) and the European Commission representation in Tanzania.

Objectifs

The objective is to enhance and expand access to water supply services for the community in Mwanza South, while also improving sanitation services in Mwanza, Bukoba, and Musoma. Such measures will contribute to enhanced livelihoods and better health for the communities residing in Mwanza, Bukoba, and Musoma. The implementation of the simplified sewer systems will prevent untreated wastewater from contaminating open drains and Lake Victoria, thereby protecting the vital ecosystem. The project is also driven by the adaptation to climate change and will strengthen the country's adaptation through the construction of resilient water supply infrastructure and the provision of resilient water supply services.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 100 million

Coût total (montant approximatif)

EUR 202 million

Aspects environnementaux

Any environmental and social impact will be addressed in accordance with the Tanzania National regulations to the satisfaction of the EIB and will be covered by the review of the project specific environmental and social management plan and resettlement action plan.

Passation des marchés

The project falls within the public sector and are subject to public procurement regulations. The promoter is required to comply with the EIB's Guide to Procurement and the tender documents will be prepared in alignment with these guidelines. Open competitive procedures will be followed by the promoter, with prequalification notices for the main contracts to be published in the EU Official Journal.

Statut

Approuvé - 19/06/2025

Milestone
À l'examen
Approuvé
19 juin 2025

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Tanzanie Eau, assainissement