Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20230607
Veröffentlichungsdatum: 8 Mai 2025

Projektträger – zwischengeschaltetes Finanzinstitut

MWANZA URBAN WATER SUPPLY AND SANITATION AUTHORITY

Ort

Beschreibung

The project will fund the expansion of water supply and sanitation services in Mwanza South, as well as the extension of the Butimba Treatment facility. The project will be implemented in close collaboration with AFD (Agence Française de Développement) and the European Commission representation in Tanzania.

Ziele

The objective is to enhance and expand access to water supply services for the community in Mwanza South, while also improving sanitation services in Mwanza, Bukoba, and Musoma. Such measures will contribute to enhanced livelihoods and better health for the communities residing in Mwanza, Bukoba, and Musoma. The implementation of the simplified sewer systems will prevent untreated wastewater from contaminating open drains and Lake Victoria, thereby protecting the vital ecosystem. The project is also driven by the adaptation to climate change and will strengthen the country's adaptation through the construction of resilient water supply infrastructure and the provision of resilient water supply services.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 100 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 202 million

Umweltaspekte

Any environmental and social impact will be addressed in accordance with the Tanzania National regulations to the satisfaction of the EIB and will be covered by the review of the project specific environmental and social management plan and resettlement action plan.

Auftragsvergabe

The project falls within the public sector and are subject to public procurement regulations. The promoter is required to comply with the EIB's Guide to Procurement and the tender documents will be prepared in alignment with these guidelines. Open competitive procedures will be followed by the promoter, with prequalification notices for the main contracts to be published in the EU Official Journal.

Projektstatus

Genehmigt - 19/06/2025

Milestone
In Prüfung
Genehmigt
19 Juni 2025

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Tansania Wasser, Abwasser