Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20140100
Date de publication: 13 octobre 2014

Promoteur – Intermédiaire Financier

LITGRID AB

Lieu

Description

The project consists of the Lithuanian part of the Lithuania-Poland asynchronous interconnector, known as LitPol Link, and the associated reinforcement of the Lithuanian electricity network. LitPol Link comprises the construction of a 500 MW back-to-back station at Alytus in south-western Lithuania and the erection of a double-circuit 400 kV overhead line (OHL) from Alytus to Elk in north-eastern Poland. The route length of the OHL is 163 km, of which 51 km will be erected in Lithuania from Alytus to the Polish border. The associated network reinforcement encompasses the construction of a 53 km-long, double-circuit 330 kV OHL connecting Alytus to Kruonis.

Objectifs

This is a key operation to support Lithuania’s energy strategy and to implement the Baltic Energy Market Interconnection Plan.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 65 million

Coût total (montant approximatif)

EUR 132 million

Aspects environnementaux

The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive. The impacts that can be typically expected for the project relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, bird collision and mortality and disturbance during construction. Environmental impact studies have been carried out and mitigating and/or compensation measures will be applied as necessary.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/17/EC and Dir. 2007/66/EC (amending Directives 1989/665/EEC and 1992/13/EEC)), with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 18/12/2014

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Lituanie Énergie