Date de publication: 4 novembre 2009
Promoteur – Intermédiaire Financier
Federal Republic of GermanyLieu
Description
The project concerns the widening of a 41 km section of the A8 motorway, part of the TEN-T network, between Ulm and Augsburg, from a 2x2 to 2x3 lane standard.
Objectifs
Upgrading of motorway (from four to six lanes) in order to reduce frequent congestion and a high accident frequency rate.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 250 million
Coût total (montant approximatif)
Currently estimated up to EUR 500 million
Aspects environnementaux
The project falls under Annex I of the EIA Directive 85/337/EEC, as amended by Directives 97/11/EC and 2003/35/EC and hence an EIA is mandatory. The findings and recommendations of the EIA will be reviewed during the appraisal.
Passation des marchés
The tender was published in the EUOJ on January 29th, 2009 (2009/S 19-026801). The concession will include design, construction, financing, maintenance and operation.
Statut
Signé - 31/05/2011