Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    100 000 000 €
    Pays
    Secteur(s)
    Italie : 100 000 000 €
    Eau, assainissement : 100 000 000 €
    Date(s) de signature
    15/10/2025 : 100 000 000 €

    Fiche récapitulative

    Date de publication
    12 mai 2025
    Statut
    Référence
    Signé | 15/10/2025
    20250222
    Nom du projet
    Promoteur – Intermédiaire financier
    CAP WATER INFRASTRUCTURE UPGRADE GREEN LOAN
    CAP HOLDING SPA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 100 million
    EUR 207 million
    Lieu
    Secteur(s)
    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    Description
    Objectifs

    The loan concerns the promoter's investment plan for the modernisation and upgrade of water supply and wastewater infrastructure in the City of Milan as well as across several provinces in the northern Italian region of Lombardy. The project will be implemented in the period 2025-2030.

    The aim is to finance water meters, extension and rehabilitation of water supply networks, rehabilitation of tanks and other related work, as well as wastewater investments to extend and rehabilitate sewer systems and wastewater treatment plants (WWTPs), among others. Additional project components include IT investments enabling digitalisation of the operations. Through this project, the promoter aims at optimising water use, improving water service quality, and ensuring security of supply in the concerned service area.

    Additionnalité et impact

    The Project supports investments in water and wastewater infrastructure by a local utility providing "Integrated Water Services" in the Lombardy Region, Italy. It ensures compliance with key European regulations in the water sector, and improves the coverage and quality of water and wastewater services. The Project contributes to the Bank's policy objectives of "Sustainable Energy and Natural Resources" as well as "Climate Action and Environmental Sustainability", and is aligned with the Bank's "Water Resilience Programme". It addresses a number of market failures through positive externalities in the form of environmental and public health benefits, notably reduced pollution incidents from sewerage overflows, improved quality of recipient waters and reduced greenhouse gas emissions from wastewater infrastructure, along with enhanced flood protection in the service area. These benefits are not entirely reflected in water tariffs and would not be realised to the same extent without public intervention.

    Furthermore, the Project addresses a chronic investment gap in water services in Italy.

    The EIB support to the Project will bring a tangible financial value added by lowering the associated cost of funding and offering, amongst others, a tenor longer the one normally proposed by other financiers. Considering the magnitude of the Project, the EIB support will also contribute to accelerate its implementation. The value added provided by the EIB is even more tangible under the current volatile market conditions, impacted by the ongoing trade conflict and geopolitical issues.



    Aspects environnementaux
    Passation des marchés

    Some of the project components might be subject to a mandatory Environmental Impact Assessment (EIA) report, including public consultations. The decision of the competent Authorities regarding their Environmental Impact Assessment will be assessed during appraisal. The proposed investments are likely to fall under Annex II of the EIA Directive 2011/92/EU amended by the Directive 2014/52/EU. Investments in water and wastewater are expected to have net positive environmental impact, considering their focus on compliance with amongst others the Water Framework Directive (WFD) 2000/60/EC and the Urban Wastewater Treatment Directive. Where and if applicable, and based on a risk-based approach as defined in the EIBG E&S Policy, the requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be checked during appraisal.

    The promoter shall ensure that contracts for implementation of the project are tendered in accordance with the applicable EU procurement legislation, (Directive 2014/24/EU and 2014/25/EU as well as Directive 92/13/EEC and Directive 89/665/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    1 octobre 2025
    15 octobre 2025

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - CAP WATER INFRASTRUCTURE UPGRADE GREEN LOAN
    Date de publication
    9 Oct 2025
    Langue
    Sujet général
    Prêts
    Numéro du document
    249918754
    Thématique du document
    Information Environnementale
    Numéro du projet
    20250222
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes