Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    40 000 000 €
    Pays
    Secteur(s)
    Serbie : 40 000 000 €
    Éducation : 40 000 000 €
    Date(s) de signature
    19/01/2023 : 40 000 000 €

    Fiche récapitulative

    Date de publication
    11 mai 2022
    Statut
    Référence
    Approuvé | 04/10/2022
    20210535
    Nom du projet
    Promoteur – Intermédiaire financier
    SERBIAN EDUCATION INFRASTRUCTURE FL
    MINISTRY OF EDUCATION, SCIENCE AND TECHNOLOGICAL DEVELOPMENT - REPUBLIC OF SERBIA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 40 million
    EUR 80 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project is a framework loan and consists of the new construction, renovation and equipping of education facilities in Serbia. The preliminary list of schemes shared by the Promoter consists mainly of regional training centres, offering vocational upper secondary, tertiary and adult education aligned with the labour market needs. However, given that the proposed operation is a framework loan, the final scope will only be known at allocation stage and, therefore, the project could also include investments in pre-primary, primary and secondary general education.

    The project supports the Serbian Government with the implementation of its Strategy for Education Development by 2030, which aims at improving the quality and the relevance of the education system. By contributing to the modernisation of education facilities, particularly of the regional training centres, the project is expected to improve the quality of education in Serbia and its alignment with the labour market needs, especially for VET studies. Consequently, these investments are expected to improve the students' employability by reducing the skill mismatch, one of the main causes of youth unemployment in the Republic of Serbia. The project also includes energy efficiency measures to significantly improve the energy performance of the education facilities and provision of new equipment to support new pedagogical methods.

    Aspects environnementaux
    Passation des marchés

    The Republic of Serbia is an EU Candidate Country. In 2004, it passed legislation updating its current legislation on environmental impact assessment that appears to converge with the EU directive at the time 1985/337/EEC including amendments up to the 2003/35/EC Directive. The principles of the 2004 legislation would satisfy the EIB's Environmental and Social Safeguards and Serbia is yet to close the acquis that would bring its current legislation into line with current EU Directives. The project is expected to be located in locations where existing school and education infrastructure exists or be redeveloping existing brown-field sites that are no longer used. Therefore, potential negative environmental and social impacts are likely to be minor. If situated in the EU, the project would likely fall within Annex II of Directive 2011/92/EU as amended by 2014/52/EU (the EIA Directive) and therefore be subject to screening. Current Serbian environmental impact assessment (EIA) legislation would screen the project components prior to providing development consent. The potential impact on any conservation areas will also need to be appraised. The compliance of the procedures in place with the EIB environmental and social standards will be analysed during the appraisal. The project is also expected to incorporate energy efficiency measures and improve the energy performance of buildings in line with the Energy Performance in Buildings Directive 2010/31/EU.

    The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Under Global Europe NDICI guarantee

    The proposed operation is expected be covered by the comprehensive guarantee granted to the EIB under the Dedicated Investment

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - SERBIAN EDUCATION INFRASTRUCTURE FL
    Date de publication
    19 Oct 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    149091658
    Thématique du document
    Information Environnementale
    Numéro du projet
    20210535
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes