Fiche récapitulative

Date de publication
10 septembre 2013
Statut
Référence
À l'examen | 10/09/2013
20130290
Nom du projet
Promoteur – Intermédiaire financier
WARMINSKO-MAZURSKIE BROADBAND (FL2012-0606)
Voivodeship of Warminsko-Mazurskie
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
PLN 39 million (EUR 9 million)
PLN 259 million (EUR 62 million)
Lieu
Secteur(s)
Description
Objectifs

The project concerns the construction of a fibre based regional backbone and distribution network including the active components for in the Polish Voivodeship of Warminsko-Mazurskie. The network, consisting of 2,241 km of fibre-optic network and 224 network nodes, will be designed to cover mostly white areas in this region and will provide open and non-discriminatory access to wholesale services necessary for the provision of basic and NGA retail broadband services. It will be designed to complement the existing telecommunication infrastructure of operators in the region.

Development of fast and reliable broadband connectivity in Europe is one of the key initiatives of the Europe 2020 Strategy. The Digital Agenda for Europe initiative states that all citizens should have access to very fast (> 30 Mbps) broadband by 2020. The project supports this initiative by providing fibre-based backbone mainly to less densely populated areas in Poland, with an effect of creating regional employment in poorer areas of the country. Currently, only around 60% of the population in the Voivodeship have access to basic broadband, but by the end of the project this number is expected to reach around 90%. The project is therefore eligible under Article 309 point (a) projects for developing less-developed regions and/or point (c) common interest. The project is also fully in line of National (e.g. National Development Strategy 2007-2015) and Community (Strategy of Informatisation for the Warminsko-Mazurskie 2007-2015) level strategies.

Aspects environnementaux
Passation des marchés

Investments in fixed telecommunications projects (mainly civil works for copper/fibre installation) do not fall under Annex I and II of Directive 2011/92/EC. According to the pre-design it is expected that the works will have limited impact as the installation of the regional transmission network is supposed to be done mostly alongside existing roads.
Furthermore under the Polish environmental regulations the project is subject to a screening as per Natura 2000 protection law. In its assessment during the project preparation the Regional Director for Environment Protection concluded that there is no significant impact on Natura 2000 during implementation and operation expected.
The environmental details related to the final design will be assessed during appraisal.

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation 2004/18/EC, with publication of tender notices in the EU Official Journal, as and where required.
The relevant works and service contracts have been published in the OJEU under 2012/S 71-117812 and under 2012/S 34-054951. Meanwhile also the contract award has been notified under 2013/S 083-139021 and 2012/S 107-177562.

Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes