Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
  • Date: 08/12/2025
  • Reference: 20180675-18

The construction of the water treatment plant to be located in La Esperanza in the parish of Quiroga, with the following components: Floating water intake, pumping pipeline, pumping system, enclosure for the collection transformer.

Treatment plant (Gabion walls, rainwater pipe system, switchyard, enclosure, compact plant foundation slab, compact modular plant, 500 m³ cistern, room for chlorine gas, chemical storage building, storage building, metal cover – metal cover for a compact modular plant, for a modular plant, covering floor, office building, control building, cistern and control building).

1 500 m³ Los Ceibos storage tank (the demolition and disassembly of existing storage tanks, gabion wall, rainwater pipe system, wastewater pipe system, control building, switchyard, fence around the tank). Access road.

Contract notice

  • Download the notice of 08/12/2025
  • Deadline for receipt of tenders or requests to participate: 19/01/2026

Disclaimer

This procurement is conducted by the EIB Borrowers/Promoters in accordance with the Guide to Procurement for the contract under the EIB-financed project. The EIB is not a party to the contract and its role is limited to those defined in the Guide to Procurement.