Design & Construction of Twin Tunnel (Up & Down by Shield TBM), Cut & Cover, Cross-passages with/without sump, Ramps, two (02) Underground Stations (Nandra Bus Stand and Bhopal Railway Station) including Architectural finishing, Water Supply, Sanitary Installation and Drainage works in entire Underground Section from chainage 28+375 to 31+765 for Bhopal Metro Rail Project.
- Date: 22/01/2025
- Reference:
Contract award notice
- Download the notice of 22/01/2025
Disclaimer
This procurement is conducted by the EIB Borrowers/Promoters in accordance with the Guide to Procurement for the contract under the EIB-financed project. The EIB is not a party to the contract and its role is limited to those defined in the Guide to Procurement.