Date de publication: 8 juillet 2009
Promoteur – Intermédiaire Financier
Private sector operation
Lieu
Description
The construction of 17 km of tolled multi-lane (2x2) limited access carriageway extending the existing 46 km tolled motorway westwards from Kingston between Sandy Bay and Four Paths. This project is a further phase of “Highway 2000”, an ongoing Build Operate and Transfer (BOT) concession contract which commenced in 2001 and is expected to last until 2036.
Objectifs
To improve the road system for inland transport. The project is expected to bring about savings in time, vehicle operating costs, road accidents and some emissions benefits as a result of network capacity enhancements.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 50 million.
Coût total (montant approximatif)
EUR 180 million.
Aspects environnementaux
If the project were to be undertaken within the EU, by virtue of its technical characteristics the project is classified as an Annex I project according to the EIA Directive 85/337/EEC, as amended. Jamaican national legislation requires a full EIA including public consultation for all road projects. A comprehensive EIA was conducted including a detailed nature assessment. The approval was granted by the competent authority following extensive public consultation. The Competent Authority issued the environmental permit in January 2008. Prior to the project-related EIA, the Jamaican Government also conducted, in 2000, a Strategic Environmental Assessment which covered the entire Highway 2000 project. The overall environment impact of this project is considered to be acceptable to the Bank.
Passation des marchés
The procurement procedures employed by the promoter are considered satisfactory to the Bank.
Statut
Signé - 18/02/2011