Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
230 000 000 €
Pays
Secteur(s)
Belgique : 230 000 000 €
Eau, assainissement : 230 000 000 €
Date(s) de signature
1/12/2023 : 230 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
21 juillet 2023
Statut
Référence
Signé | 01/12/2023
20230016
Nom du projet
Promoteur – Intermédiaire financier
WALLONIA SUSTAINABLE WASTEWATER TREATMENT II
SOCIETE PUBLIQUE DE GESTION DE L'EAU
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 230 million
EUR 470 million
Lieu
Secteur(s)
  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Description
Objectifs

The project will co-finance the investment programme 2023-2026 of Société Publique de Gestion de l'Eau (SPGE, Public Water Management Company) in the Walloon Region, in charge of wastewater sanitation (from sewerage to water treatment plant) and catchment protection.

The project will allow the promoter to reduce water bodies pollution and thus contribute to environmental protection. By improving water resources preservation, the project will also contribute to climate change resilience. It is therefore in line the EIB's water sector orientation. One of the five provinces of Wallonia (Luxembourg) is a less developed region while the three others (Hainaut, Namur and Liège) are transition regions for the period 2021-2027, under the EU Cohesion Policy. The project is therefore eligible under Article 309 point (a) projects for developing less-developed regions and point (c) common interest.

Additionality and Impact

The project concerns the 2023-2026 investment programme of SPGE "Société Publique de Gestion de l'Eau", which is Wallonia Region's asset holding company for wastewater infrastructure and for the protection of water sources. The programme consists mainly of renewal and upgrading of sewage collectors, wastewater treatment plants and pumping stations. All 3.7 million inhabitants of this Region (most of which is an EIB Cohesion Area) will benefit from the investments. The project aims at compliance with the Water Framework Directive (improving the quality of water bodies) and the Urban Waste Water Treatment Directive (improving the quality of effluent) and at maintaining or enhancing service quality. The project will be implemented by a promoter with good capacity, as demonstrated in seven previous operations. The investments will also enable the promoter to reduce energy consumption and to better cope with drought periods and torrential rains. The project will contribute to mitigating market failures in the water sector by financing infrastructure, which generates positive environmental, public health and climate externalities that are not fully reflected in the applicable wastewater tariffs in Belgium.

The Bank's loan provides an important contribution to the Borrower's long-term funding base, fully matching the very long economic life of the underlying assets. The Borrower benefits from a draw down period of several years that reflects the lengthy implementation period of the project. The loan offers an advantageous very long-term fixed rate that contributes to keeping the water tariffs affordable.

Aspects environnementaux
Passation des marchés

The project will help the promoter comply with the Urban Wastewater directive (EC 91/271/EEC), the Water Framework Directive (2000/60/EC), and the Drinking Water Directive (2020/2184/EU). Several of the schemes included in the project might fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU (amending the EIA Directive 2011/92/EU). Environmental Impact Assessment procedures are carried out where required by the competent authorities and mitigating measures are applied as appropriate. The promoter must also comply with the requirements of the Water Framework Directive, including Art 4(7) where appropriate. Where and if applicable, the requirements of the Habitats and Birds Directives (92/43/EEC and 2009/147/EC) will be verified during appraisal. The EIB's appraisal will focus on the Promoter's environmental management capacity to properly apply these EU Directives. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, climate adaptation, pollution prevention and control, sustainable use and protection of water and marine resources.

The promoter has to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and/or 2014/24/EU and/or 2014/23/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
24 octobre 2023
1 décembre 2023
Lien vers la source
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - WALLONIA SUSTAINABLE WASTEWATER TREATMENT II
Date de publication
28 Oct 2023
Langue
Sujet général
Prêts
Numéro du document
171919628
Thématique du document
Information Environnementale
Numéro du projet
20230016
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes