Description
Framework loan for financing multi-sector investments as part of the sustainable development programme of the Department of Eure for the period 2024-2028.
Objectifs
The project supports investment in public buildings, urban development, sustainable mobility and adaptation to climate change. This is expected to contribute to better balanced territorial development, reducing inequalities between people and between places. It will therefore improve living conditions in the department as well as strengthen socio-economic prosperity.
Secteur(s)
- Infrastructure composite - Construction
Montant BEI envisagé (montant approximatif)
EUR 100 million
Coût total (montant approximatif)
EUR 390 million
Aspects environnementaux
The Promoter will be required to act according to the provisions of the relevant EU Directives including, but not limited to, SEA (2001/42/EC), EIA (2011/92/EU amended by Directive 2014/52/EU), Habitats (92/43/EEC) and Birds (2009/147/EC) Directives and Water Framework Directive (2000/60/EC) as transposed into national law. The Bank will also assess the Promoter's compliance with the Energy performance of buildings directive (Directive EU/2018/844) at appraisal and during the allocation phase. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and climate adaptation.
Passation des marchés
The Bank will require the promoter to ensure that contracts for implementation of the project have been or will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Statut
À l'examen - 3/10/2023
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).